Projects

Commercial

ICE District - Tower E (Stantec Tower)

Location: Edmonton, AB
Completion: 2019

The Stantec Tower is a mixed-use skyscraper located at the heart of Edmonton’s ICE District. This architecturally stunning tower stands 251 meters (823 feet) high and is the tallest building in Canada outside of Toronto. It was granted LEED Gold Certification and received the Award of Excellence from the Consulting Engineers of Alberta in 2020.

learn more

Brookfield Place

Location: Calgary, AB
Completion: 2017

Brookfield Place consists of a 1.4 million square feet, 56-storey tower which is 247 meters tall, making it Calgary’s tallest building.

The building was constructed to LEED Gold standards for core and shell and was completed in August 2017. A half-acre public plaza, electric car recharge stations and energy conservation systems all contributed to the novelty of the building’s design.

learn more

Kelly Ramsay Tower (Now Enbridge Centre)

Location: Edmonton, AB
Completion: 2016

WEM was hired by Ledcor Construction to complete the electrical contracting component of a substantial tear down of existing Kelly Ramsay buildings in Edmonton, reconstruction from ground up. As the electrical contractor of choice, WEM supplied and installed the lighting, lighting controls, distribution, fire alarm, security and emergency generators systems to the new build.

learn more

Calgary City Centre

Location: Calgary, AB
Completion: 2015

Calgary City Centre office tower is a 36 storey class AAA building equipped with many state-of-the-art features including five stories of occupancy sensor lighting controlled underground parking, eight high-speed elevators, a sophisticated security system and sustainable energy sources.

learn more

Mosaic Tower at Hill Centre III

Location: Regina, SK
Completion: 2013

The Mosiac Tower at Hill Centre III is an architecturally stunning building that aligns perfectly with the symmetry of its neighboring buildings. It stands 18 stories high, has 240,000 square feet of office/retail space, and features a sprawling 1,300 square foot conference centre, a 3,000 square foot rooftop patio and a public atrium with rotating art exhibits.

learn more

Commercial project archive:
  • Fifth Avenue Place Fire Alarm Replacement; Calgary, AB; 2019
  • Stock Exchange Fire Alarm Replacement; Calgary, AB; 2018
  • Eau Claire Tower; Calgary, AB; 2016
  • Eigth Avenue Place - West Tower; Calgary, AB; 2014
  • The Bow Base Building; Calgary, AB; 2012
  • Centennial East and West Towers; Calgary, AB; 2010
  • Bankers Court; Calgary, AB; 2008
  • OPUS 2; Calgary, AB; 2008
  • Southland 4 Office Tower; Calgary, AB; 2007
  • OPUS 8; Calgary, AB; 2006

Tenant Fit up

Cenovus Energy – Tenant Fit up in Brookfield Place

Location: Calgary, AB
Completion: 2020

Cenovus’s offices occupy the upper floors of Brookfield Place, which is the tallest building in Calgary at 247 meters high. WEM was contracted by Ellis Don Construction to supply and install the electrical and telecommunication components of the tenant fitout for Cenovus, following the completion of Brookfield Place’s shell. This expansive fit-out required the development of 25-floors of interior office space. Cenovus’s state-of-the-art offices extended from the 32nd floor to the top 56th floor of the East Tower.

learn more

Encana & Cenovus - Tenant Fit up in Bow Tower

Location: Calgary, AB
Completion: 2012

WEM completed the electrical work for the base building and the tenant fit-outs for both Encana Corporation and Cenovus Energy. As the electrical contractor for these projects, WEM was responsible for providing the distribution, emergency responders DAS, lightning protection, wireless lighting control system, security, fire alarm, emergency power, sound masking, telecommunications and temporary power systems.

learn more

Tenant Fit up project archive:
  • Husky Restack; Calgary, AB; 2019
  • Glenmore Professional Centre ; Calgary, AB; 2018
  • Scotia Bank; Calgary, AB; 2018
  • Cisco; Calgary, AB; 2018
  • MEG Energy; Calgary, AB; 2018
  • WSP Engineering; Calgary, AB; 2018
  • Solium; Calgary, AB; 2017
  • Progress Energy; Calgary, AB; 2017
  • JSS Barristers; Calgary, AB; 2017
  • Simons; Calgary, AB; 2017
  • Ernst and Young; Calgary, AB; 2016
  • Inter Pipeline; Calgary, AB; 2016
  • Cresent Point Energy; Calgary, AB; 2015
  • Chevron Restack; Calgary, AB; 2015
  • APACHE; Calgary, AB; 2013
  • Devonian Gardens; Calgary, AB; 2012

Retail / Shopping Centres

Deerfoot City

Location: Calgary, AB
Completion: 2019

Deerfoot City is 1.1 million square foot open-air style shopping complex spanning 80 acres with over a 150 shops, services, and restaurants. The shopping complex consists of a Food Lodge area as a central place offering many options to eat at, a Style District made up of many shops and services, a Restaurant Campus that offers everything from fine dining to casual eating and a Central Plaza which is a great area to socialize.

learn more

Retail / Shopping Centres project archive:
  • Sunridge Mall Renovation; Calgary, AB; 2019
  • KingsWay Mall Renovation; Edmonton, AB; 2018
  • Crossiron Mills Mall Foodcourt Expansion; Calgary, AB; 2017
  • SLGA Warehouse; Regina, SK; 2015
  • Target RDC; Calgary, AB; 2013
  • Chinook Centre Expansion; Calgary, AB; 2010
  • The Core Redevelopment; Calgary, AB; 2009
  • Crossiron Mills Mall; Calgary, AB; 2008

Medical Facilities


Medical Facilities project archive:
  • Foothills Medical Centre - McCaig Tower; Calgary, AB; 2012
  • Health on 12th - Sheldon Chumir Centre; Calgary, AB; 2008

Institutional / Sports

Shane Homes YMCA at Rocky Ridge

Location: Calgary, AB
Completion: 2017

The Rocky Ridge Recreational Facility is a 23,330 m2 complex located in Calgary’s northwest. It was completed in December 2017 and has since received over five engineering and design awards. A competition pool, a leisure pool, two ice rinks, a library, theatre and three full size gymnasiums are some its many recreational amenities.

learn more

Saskatoon Police Services - Headquarters Building

Location: Saskatoon, SK
Completion: 2015

The City of Saskatoon’s objective for this iconic project was to develop a progressive facility that consolidated the original Saskatoon Police Services Headquarters and nine satellite offices into one centralized location. WEM was selected by Ellis-Don to provide electrical contracting services during both the pre-construction and construction phases. In the ‘design-build’ capacity, WEM provided input on the building’s distribution, emergency and security systems.

learn more

Institutional / Sports project archive:
  • U of R College West Residence Renewal Project; Regina, SK; 2018
  • King Edwards Arts Hub; Calgary, AB; 2018
  • Esplanade Arts & Heritage Centre; Medicine Hat, AB; 2005

Data Centres


Data Centres project archive:
  • IOL Quarry Park Campus Data Cabling; Calgary, AB; 2017
  • Q9 Network Data Centres (Cal 2 and Cal 3); Calgary, AB; 2007-Present

Western Electrical Icon
Learn more about Western Electrical

The employees at Western Electrical are an amazing group of skilled professionals who are approachable, friendly and easy-to-work with. We take pride in our people, our business partners and our community.

Learn more about the Western Electrical team